1. 09 May, 2025 1 commit
  2. 08 May, 2025 1 commit
    • Graham King's avatar
      feat: Qwen3, Gemma3 and Llama4 support (#1002) · ceaeba3e
      Graham King authored
      . New mistralrs and llamacpp version
      . mistralrs: Handle Gemma 3 and Llama 4 as vision models
      . Update the dynamo-run docs to use Qwen 3
      . Our pre-processor now supports Llama 4's newer multi-modal `config.json`
      . Upgrade minijinja to handle Qwen 3's prompt template
      
      For Llama 4 we'll need to limit the max seq len. vllm says:
      > To serve at least one request with the models's max seq len (10485760), (240.00 GiB KV cache is needed,...
      
      I was able to run Llama 4 with llamacpp and a quantized GGUF, with Dynamo doing the pre-processing.
      ceaeba3e
  3. 06 May, 2025 1 commit
    • Graham King's avatar
      feat: dynamo-run <-> python interop (#934) · 99cd9d85
      Graham King authored
      Adding this to a Python script makes it register on the network so that `dynamo-run` can discover it and send it requests:
      ```
      from dynamo.llm import register_llm
      
      MODEL = "Qwen/Qwen2.5-0.5B-Instruct"
      await register_llm(endpoint, MODEL, 3)
      ```
      
      Full vllm example, with pre-processing in dynamo:
      - `dynamo-run in=text out=dyn://dynamo.backend.generate`
      - `cd lib/bindings/python/examples/hello_world`
      - `python server_vllm.py`
      
      This builds on top of the work to move pre-processor to ingress side. It means we can decouple Rust and Python using NATS as the bus.
      
      The `register_llm` call does this:
      
      - Download the model from HF if necessary
      - Load the model deployment card from the HF folder or extract from GGUF
      - Push the tokenizer config etc into NATS object store so ingress can access it from a different machine
      - Publish the model deployment card to ETCD
      99cd9d85
  4. 01 May, 2025 1 commit
  5. 29 Apr, 2025 1 commit
    • Graham King's avatar
      chore: Split PushRouter from Client (#817) · a1a10365
      Graham King authored
      In a distributed system we don't know if the remote workers need pre-processing done ingress-side or not. Previously Client required us to decide this before discovering the remote endpoints, which was fine because pre-processing was worker-side.
      
      As part of moving pre-processing back to ingress-side we need to split this into two steps:
      - Client discovers the endpoints, and (later PR) will fetch their Model Deployment Card.
      - PushRouter will use the Model Deployment Card to decide if they need pre-processing or not, which affects the types of the generic parameters.
      
      Part of #743
      a1a10365
  6. 25 Apr, 2025 2 commits
    • Harrison Saturley-Hall's avatar
    • Graham King's avatar
      chore: Publish Model Deployment Card to NATS (#799) · d346782c
      Graham King authored
      This will allow an ingress-side pre-processor to see it without needing a model checkout.
      
      Currently pre-processing is done in the worker, which has access to the model deployment card ("MDC") files (`config.json`, `tokenizer.json` and `tokenizer_config.json`) locally. We want to move the pre-processor to the ingress side to support KV routing. That requires ingress side (i.e the HTTP server), on a different machine than the worker to be able to see those three files.
      
      To support that this PR makes the worker upload the contents of those files to the NATS object store, and publishes the MDC with those NATS urls to the key-value store. 
      
      The key-value store has an interface so any store (nats, etcd, redis, etc) can be supported. Implementations for memory and NATS are provided.
      
      Fetching the MDC from the store, doing pre-processing ingress side, and publishing a card backed by a GGUF, are all for a later commit.
      
      Part of #743 
      d346782c
  7. 09 Apr, 2025 1 commit
  8. 03 Apr, 2025 1 commit
  9. 31 Mar, 2025 1 commit
  10. 24 Mar, 2025 1 commit
  11. 19 Mar, 2025 1 commit
    • Graham King's avatar
      chore: Don't depend on openssl (#292) · 7c3fd5c9
      Graham King authored
      This makes the Rust parts all use ring / rustls library instead of local install of openssl. It's a step on the journey to being statically linked.
      
      Pieces:
      - `tokenizers` and `mistralrs` now support rustls (mistralrs by default, tokenizers with feature flag).
      - Move shared dependencies up into workspace
      - New `rand` crate has some renames for future rust
      - Ensure the dependency doesn't creep back in by enforcing it with cargo deny.
      7c3fd5c9
  12. 14 Mar, 2025 1 commit
  13. 13 Mar, 2025 1 commit
  14. 10 Mar, 2025 1 commit
  15. 08 Mar, 2025 1 commit
  16. 07 Mar, 2025 1 commit
    • Graham King's avatar
      feat: Python bring-your-own-engine with our tokenizer (#47) · 12714d90
      Graham King authored
      Instead of using `out=pystr:<my.py>` we can now do this:
      ```
      dynemo-run out=pytok:/home/graham/my_python_engine.py --model-path <hf-repo-checkout>
      ```
      
      That engine will receive and respond with tokens. Here's an example engine file:
      ```
      import asyncio
      
      async def generate(request):
          yield {"token_ids":[791]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[6864]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[315]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[9822]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[374]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[12366]}
          await asyncio.sleep(0.1)
          yield {"token_ids":[13]}
      ```
      
      Also reduce duplication by making the bindings engine use the llm lib engine.
      12714d90
  17. 05 Mar, 2025 1 commit
  18. 28 Feb, 2025 1 commit
  19. 27 Feb, 2025 1 commit
  20. 26 Feb, 2025 1 commit
  21. 25 Feb, 2025 4 commits
  22. 24 Feb, 2025 1 commit
  23. 20 Feb, 2025 1 commit
  24. 18 Feb, 2025 1 commit
  25. 13 Feb, 2025 1 commit
  26. 12 Feb, 2025 2 commits
  27. 11 Feb, 2025 1 commit
  28. 10 Feb, 2025 3 commits
  29. 05 Feb, 2025 1 commit
  30. 04 Feb, 2025 1 commit